The significance of mentioning this today is that between 7-8 pm tonight the blades of the two turbines are being transported through Grampound from the Truro direction ready for erection on the Garlenick site. This should be an interesting sight and I will take photos and post them tomorrow. In the meantime below are a couple of photos of the site being developed.
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
BlogNews and photos from the Grampound Village Store and Coffee Shop. Archives
October 2015
Categories |